Wanted pages

Jump to: navigation, search

Showing below up to 50 results in range #201 to #250.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)

  1. The software did not provide much support for formatting of the outputs in a format that could be.Knowledge management process‏‎ (1 link)
  2. SIGFOR.Description of DSS development‏‎ (1 link)
  3. ForEco‏‎ (1 link)
  4. ETÇAP.Knowledge management process‏‎ (1 link)
  5. To meet the needs of customer - the Forest Service - and to obtain satisfying results the.Description of DSS development‏‎ (1 link)
  6. TreeSoftware‏‎ (1 link)
  7. Model building was rapid, it was assembling the data that took by far the most time.Description of DSS development‏‎ (1 link)
  8. Academic DSS‏‎ (1 link)
  9. Spatial variation between regions led to the development of different regional models, which led to.Decision support techniques‏‎ (1 link)
  10. NED.Knowledge management process‏‎ (1 link)
  11. Finland-Integrating wood quality considerations in landscape-level forest planning.Knowledge management process‏‎ (1 link)
  12. An optimisation module comparing alternative scenarios based on multi-criteria analysis should be.Support of social participation‏‎ (1 link)
  13. VägRust‏‎ (1 link)
  14. Operational aspects of the system should be enhanced.Description of DSS development‏‎ (1 link)
  15. Ministerium für Umwelt‏‎ (1 link)
  16. Users preferred enhanced functionality rather than useability.Support of social participation‏‎ (1 link)
  17. Brazil: Short rotation eucalyptus pulp wood plantations.Description of DSS development‏‎ (1 link)
  18. Carlos I of Portugal‏‎ (1 link)
  19. Portugal-Developing a collaborative management plan for the NIFP in Vale do Sousa.Description of DSS development‏‎ (1 link)
  20. HARVEST.Description of DSS development‏‎ (1 link)
  21. Philip IV of Spain‏‎ (1 link)
  22. Landscape value‏‎ (1 link)
  23. Ireland-PractiSFM multi-resource inventory and decision support for private forest owners.Knowledge management process‏‎ (1 link)
  24. The analysis of the actor network interactions allowed to identify the criticalities to be solved in order to develop the collaborative process.Knowledge management process‏‎ (1 link)
  25. Requirement of specialized skills can discourage some potential users.Knowledge management process‏‎ (1 link)
  26. FOpP‏‎ (1 link)
  27. Despite the widely use and acceptance of the DSS there was still a lack of expertise to.Knowledge management process‏‎ (1 link)
  28. The use of structured output (maps, tables and charts) makes the methodology and the results more.Decision support techniques‏‎ (1 link)
  29. SIMFLOR.Support of social participation‏‎ (1 link)
  30. Model building was rapid, it was assembling the data that took by far the most time.Decision support techniques‏‎ (1 link)
  31. Enabling the analyses of several ecosystem services (timber and non-timber resources) in one and the.Decision support techniques‏‎ (1 link)
  32. A financial analysis is an important component in the discussion about the preferences of different.Description of DSS development‏‎ (1 link)
  33. GIS model for predicting salvage cut‏‎ (1 link)
  34. Template:DSS description, Installation and support‏‎ (1 link)
  35. Question: How can stakeholders and users involvement in all phases of the DSS development project being facilitated?‏‎ (1 link)
  36. Stakeholder involvement in DSS design.Support of social participation‏‎ (1 link)
  37. Need of flexibilization of analytical tools - no overdesigned tool that provides too much features for the use.Decision support techniques‏‎ (1 link)
  38. SMART - Simple Multiple Attribute Ranking‏‎ (1 link)
  39. United States-The restoration strategy of the dry and mesic landscape in the Okanogan Wenatchee National Forest.Description of DSS development‏‎ (1 link)
  40. Austria-Improving forestry extension services for small-scale private landowners.Decision support techniques‏‎ (1 link)
  41. Proximities‏‎ (1 link)
  42. LIFT‏‎ (1 link)
  43. Visualization of the preliminary actor network made the people explicity include the DSS in a planning process.Knowledge management process‏‎ (1 link)
  44. Alternative silvicultural prescriptions can be computed or an already existing scenario modified. Thereby the user is supported by the scenario manager. For a given scenario‏‎ (1 link)
  45. John III of Portugal‏‎ (1 link)
  46. Portugal-Pulpwood Supply Chain Planning in a Portuguese integrated Pulp and Paper Company.Decision support techniques‏‎ (1 link)
  47. Heureka/PlanEval‏‎ (1 link)
  48. The DSS models built must match the knowledge of the local forest managers, so the ability for local.Knowledge management process‏‎ (1 link)
  49. It was decided to develop a highly detailed system in order that it could be used in the most.Knowledge management process‏‎ (1 link)
  50. It is necessary to know which data will be use as variables in the models before designing the DSS.Knowledge management process‏‎ (1 link)

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)